APF Harmonic Mitigation Verification for Three 2500 kVA Transformer Circuits
MEASUREMENT DATE 2026-03-04 |
MEASUREMENT POINT Incoming cabinet |
CIRCUITS TM1 / TM2 / TM3 |
TRANSFORMER CAPACITY 2500 kVA each |
REFERENCE STANDARD GB/T 14549-93 |
PURPOSE Verify harmonic mitigation after APF operation |
1. Project Background
The transformer circuits were operating with multiple load devices and produced significant harmonic current. After the active power filters had been installed and operated for approximately three months, a harmonic re-test was carried out on March 4, 2026 to verify the harmonic mitigation performance with the filters in operation.
2. Measurement Configuration
The report identifies three measurement circuits: TM1, TM2 and TM3. Each transformer has a total capacity of 2500 kVA. The measurement point was the incoming cabinet. The system diagram shows the 10 kV / 400 V transformer, capacitor branch, newly added APF, load and measurement points.

Source evidence: system and measurement-point diagram from the project report.
3. Field Re-test Evidence
The report records APF-off and APF-on measurements for voltage/current waveforms, voltage distortion, current distortion, and the 1st, 3rd, 5th and 7th harmonic currents on the three transformer circuits.

Source evidence: field measurement at the incoming cabinet.
TM1 — APF Off / APF On
 |
 |
| APF OFF — source measurement screenshots |
APF ON — source measurement screenshots |
TM2 — APF Off / APF On
 |
 |
| APF OFF — source measurement screenshots |
APF ON — source measurement screenshots |
TM3 — APF Off / APF On
 |
 |
| APF OFF — source measurement screenshots |
APF ON — source measurement screenshots |
4. Measured Results
The following values are reproduced from the report’s result-analysis summary table.

Source evidence: original report summary table for TM1, TM2 and TM3.
5. Report Conclusion
The report concludes that, after the retrofit, ITHD and the measured 3rd, 5th and 7th harmonic contents were below the harmonic control limits stated in the report, met the expected target, and satisfied the acceptance criteria. The report also states that the measurement-instrument data were basically consistent with the filter-cabinet display data.