EV Charging Station – Low Power Factor from Capacitive Reactive Power
PROJECT CASE | EV CHARGING STATION
SVG compensation for 21 DC chargers in daytime standby — power factor restored from 0.1–0.2 (capacitive) to 0.99 (inductive), annual saving RMB 76,000.
INDUSTRY EV Charging Infrastructure |
INSTALLED CHARGERS 21 DC chargers |
OPERATING CONDITION Daytime standby |
1. Project Background
The site has 21 DC chargers. During daytime, the chargers are mainly in standby. Capacitive reactive power is present, resulting in a low system power factor. The existing capacitor bank could not meet this reactive power compensation requirement.

Charging station site.
2. Measured Condition
Measurements were taken on the low-voltage sides of a 2500 kVA transformer and a 2000 kVA transformer while the chargers were in standby.
| Point |
Transformer |
Total Capacitive Reactive Power |
Power Factor |
| P01 |
2500 kVA |
50.26 kvar |
0.1–0.2, capacitive |
| P06 |
2000 kVA |
38.16 kvar |
0.1–0.2, capacitive |
3. Measurement Evidence
| P01 — 2500 kVA transformer |
P06 — 2000 kVA transformer |
 |
 |
| Power |
Power Factor |
 |
 |
Source evidence: standby measurements on the low-voltage sides of both transformers.
4. SVG Compensation Solution
One 100 kvar SVG module was recommended for each transformer section.
- The existing capacitor cabinet was emptied and its structure adjusted to install the 100 kvar SVG module.
- Current transformers with accuracy class 0.2 or higher were specified: 4000:5 for the 2500 kVA transformer section and 3000:5 for the 2000 kVA transformer section.
- Based on the reactive power measured while the chargers were in standby, the SVG constant-reactive-power function was used to set a fixed reactive current output.
- If system reactive power varies significantly, the compensation effect may decrease.
5. Installation Diagram

6. Project Results
- After the retrofit, the power factor remained at the target value of 0.99 (inductive) in both standby and charging operation.
- The standby capacitive condition was avoided.
- Compared with before the retrofit, the monthly power-factor adjustment reward increased by RMB 3,200 per transformer.
- For the two transformers, the annual saving was RMB 76,000, with the investment recovered within two years.
- SVG compensation reduced part of the line loss, increased the terminal line voltage, and improved the stability and safety of the line system.